Changelog

New features, improvements, and updates to the Skyello platform.

DJI Dock 2 Integration

Full support for DJI Dock 2 autonomous drone stations. Skyello can now control camera payloads and execute agentic flight missions directly from the platform — no manual pilot required. Schedule inspections, trigger on-demand flights, and stream live imagery back to the dashboard.

Fleet Control Connected
DJI Dock 2 — Unit 4 North Matrice 3TD · Battery: 96% · Idle
142 Flights
97% Uptime
24/7 Coverage
Active Mission In Flight
Route Unit 4 Perimeter — 18 waypoints
Camera Zoom 10x · Thermal overlay
Progress
72%
Camera Waypoints Schedule RTH

AprilTag Asset Tracking

Scan physical AprilTag markers on field assets using the mobile app's camera. The system resolves each tag to its registered asset record instantly, eliminating manual asset lookup during inspections.

Tag Scanner Live
TAG DETECTED
Focus: Auto Distance: 1.2m
Tag ID AT-04821
Asset Drain Valve DV-112
Unit Cooling Tower 4
Last Inspected 86 days ago

Analytics Dashboard & 3D Spatial Overlays

Redesigned analytics page with updated visualizations for compliance trends across your facility. New 3D spatial overlay endpoints let you view inspection data layered onto facility maps.

Analytics
Compliance Assets Trends
97.3% Compliance
1,247 Assets
18 Open Findings
Inspections Completed — Last 8 Weeks
W1
W2
W3
W4
W5
W6
W7
W8
3D Spatial View New
x: 42.18 y: 89.04 z: 12.5

Global Dashboard, Consent Decree Rule Packs & SOP Rules

A new cross-site compliance dashboard showing posture scores across every facility in your organization. Consent decree obligations can now be loaded as structured rule packs. SOPs can be configured as enforceable rules tied to specific assets and schedules.

Global Compliance All Sites
Port Arthur Refinery Texas · 1,247 assets
97.3%
Whiting Refinery Indiana · 892 assets
84.1%
Baytown Complex Texas · 2,104 assets
95.8%
Active Rule Packs
CD
BP Whiting Consent Decree 142 obligations · Active
SOP
Drainage Inspection Protocol 38 rules · Active

PDF Export & Automatic Session Timeout

Export work orders and proposals as formatted PDFs — ready for handoff or audit. Sessions now automatically lock after inactivity, with a warning modal before logout.

Work Order #WO-2847 Export PDF
Cooling Tower Basin — Remediation Priority: High
Assigned to: Field Team B · Due: Jan 12, 2026
Scope
Linked Findings
F-1204 Corrosion on drain valve DV-112 Critical
F-1209 Missing gasket on flange connection High
Citation
40 CFR § 63.654(b)(2) — BWON drain inspection requirements

Work Order Proposals

Full proposal workflow for work orders — create, review, and approve remediation plans before they become active work orders. Proposals include scope, priority, and linked findings.

Proposals 7 active
#P-0041 Approved
Unit 4 Drain Remediation
3 assets · High priority Approved Dec 28
#P-0040 In Review
AGSL Inspection Backlog — Q1
12 assets · Medium priority Submitted Dec 26
#P-0039 Draft
Manhole Cover Replacement Program
8 assets · Low priority Created Dec 24
#P-0038 Approved
Containment Sump Emergency Repair
1 asset · Critical Approved Dec 23

Rule Engine & Live Activity

The rule engine is live — regulations and SOPs are parsed into machine-executable rules with citation traceability back to the source document. The dashboard now shows a real-time activity feed of inspections, findings, and status changes across the facility.

Rule Engine 847 rules active
R-0142
Drain inspection within 90-day window 40 CFR § 63.654(b)(2)
Passing
R-0143
AGSL visual inspection quarterly 40 CFR § 63.655(c)(1)
At Risk
R-0144
Containment sump integrity check Consent Decree § 4.2.1
Failing
Live Activity
Inspection completed on DR-4112 2m ago
Work order WO-2841 approved 8m ago
Finding flagged on MH-0089 14m ago

Device Registry & Real-Time Presence

Mobile devices can now be enrolled and managed through a device registry. Real-time presence shows which team members are currently active across the web and partner apps.

Devices & Presence 6 online
iPhone 15 Pro — M. Torres Field Team A · Last active: now
iOS 18.2
iPad Air — J. Chen Field Team B · Last active: now
iPadOS 18.2
Pixel 8 — R. Patel Partner · Last active: now
Android 15
iPhone 14 — S. Kim Field Team A · Last active: 24m ago
iOS 18.1
Galaxy S24 — D. Williams Field Team C · Last active: 3h ago
Android 14

Certifications Tracking & Mobile v1.4

A new certifications module tracks operator and equipment certifications with expiry dates and renewal status. Mobile app v1.4 ships with reliability improvements and push notification support.

Certifications 24 tracked
OSHA 30-Hour Construction M. Torres · Field Team A
Exp. Aug 2026 Valid
API 653 Tank Inspection J. Chen · Field Team B
Exp. Mar 2026 Expiring
H2S Safety Certification R. Patel · Partner
Exp. Jan 2026 Expired
Confined Space Entry S. Kim · Field Team A
Exp. Nov 2026 Valid

User Invitations

Invite new users to your organization via email. Invitations are scoped by role and site, and recipients complete onboarding through a secure token-based flow.

Team Invitations + Invite
Email
j.martinez@contractor.com
Role
Inspector
Site
Port Arthur
Send Invitation
Pending Invitations
d.nguyen@partner.com Inspector · Baytown · Sent 2d ago
Pending
a.brown@ops.com Admin · All Sites · Sent 4d ago
Accepted

Push Notifications

Inspection assignments, finding alerts, and status updates now push directly to iOS and Android devices. Notifications are configurable per user.

Notifications 3 new
Critical finding on DR-4112 Corrosion detected during inspection. Immediate action required. 2 minutes ago
Inspection assigned: Unit 4 Drainage 12 assets due by Jan 15. Tap to view route. 18 minutes ago
Work order WO-2841 approved Remediation work order ready for dispatch. 1 hour ago
Weekly compliance summary ready Port Arthur — 97.3% overall compliance. Yesterday