AI-powered compliance verification for critical infrastructure.

Skyello parses regulations, dispatches autonomous agents, and verifies every obligation across your facilities — with full citation traceability from field to filing.

Explore all

Skyello turns documents, field data, and regulations into a single system of record — then lets you talk to it.

Documents
54 files Upload
PDF
Consent_Decree_2024.pdf 2.4 MB · 3h ago
DOC
SOP_Drainage_Inspections.docx 840 KB · 3h ago
XLS
Asset_Registry_Q4.xlsx 1.1 MB · 2h ago
PDF
EPA_Compliance_Requirements.pdf 5.8 MB · 1h ago
PDF
Inspection_Criteria_Rev3.pdf Processing obligations...
XLS
Work_Order_History_2024.xlsx 3.2 MB · Queued

Ingest

Upload SOPs, regulatory documents, and asset data. Skyello parses and encodes every obligation automatically.

COGNIT Online
Which assets are overdue for inspection?
12 drain assets in Unit 4 are past their 90-day inspection window.
3 flagged critical — last inspected 142 days ago.
DR-4112 Cooling Tower Basin 142d
DR-4089 Process Sewer Jct. 136d
DR-4201 Containment Sump 128d
Generate a remediation work order for all three
Ask about your facility...

Agents

Ask questions in natural language. AI agents query your facility data, check compliance, and generate reports in real time.

Compliance Report
Port Arthur Refinery · Q4 2025
Export
97.3%
Overall Compliance
+2.1% vs Q3
1,247 Assets tracked
18 Open findings
3 Critical
Drainage
100%
Manholes
96%
AGSL
91%
Critical
67%
Generated Feb 22, 2026 · 14:52 UTC Audit-ready

Enforce

Continuous compliance tracking with audit-ready documentation. Every obligation verified, every gap surfaced.

AI agents that physically inspect your facility.

Skyello dispatches drones to autonomously inspect assets, capture imagery, and flag issues — without a human touching a controller.

Agent-024 · Autonomous Inspection
Wall Segment 7 · Sector NW-3
Scanning · Wall Segment 7 of 12
REC

Autonomous flight

Skyello plans and executes inspection routes with no human pilot required.

Vision & detection

Onboard AI identifies corrosion, leaks, structural damage, and compliance gaps from captured imagery.

Closed-loop response

Findings are automatically logged, work orders generated, and compliance records updated in real-time.

Every regulation, encoded. Every inspection, cited.

Skyello parses consent decrees, EPA requirements, and SOPs — converting every obligation into a machine-executable rule. When an inspector checks an asset, the system cites the exact regulation requiring it.

Source Document PDF
UNITED STATES DISTRICT COURT
NORTHERN DISTRICT
UNITED STATES OF AMERICA,
Plaintiff,
v.
[RESPONDENT],
Defendant.
Case No. 2:XX-cv-00XXX
CONSENT DECREE
Section V.D — Walkthrough Inspection Requirements

26. Respondent shall conduct weekly walkthrough inspections of all designated BWON Equipment and monthly walkthrough inspections of all other BWON Equipment and QQQ Equipment (excluding internal floating roof tanks) to monitor for audio observations, olfactory observations, and visual observations, such as cracking in caulk or epoxy or liquid material visible on any interface where any detectable emissions could occur.

27. Each walkthrough inspection shall be documented in a log that includes the date of inspection, the identity of the inspector, the equipment inspected, and a description of any observation made.

28. For equipment that is out of service or within a Temporary Exclusion Zone, Respondent shall document the basis for exclusion and the anticipated date of return to service...

Extracted Rule
CRITICAL bwon.equipment.cover_integrity

BWON Equipment Cover and Lid Integrity

All BWON and QQQ equipment covers and lids must be intact and properly sealed. Monitor for cracking in caulk or epoxy, or liquid material visible on any interface.

Applies to
drain junction_box sump tank
Inspection Method
visual olfactory auditory
Frequency Weekly (Designated) · Monthly (All other)
Finding Cover or lid is missing, damaged, or not properly sealed — violates NDE standard
Corrective Action Initiate repair within 24 hours. If not feasible, document basis for delay and schedule during next available turnaround.
Citations
§ Consent Decree Section V.D, Paragraph 26
§ 40 CFR 61.342-1(c)(1)(ii)
§ 40 CFR 61 Subpart V — Equipment Standards

At Inspection

DR-0247 Process Drain · Unit 300
PASS
Visual inspection — interface integrity Cover intact, no cracking in caulk or epoxy, no visible liquid material at interface
Required by Consent Decree § V.D ¶ 26 · 40 CFR 61.342-1(c)(1)(ii)

Regulatory parsing

Upload consent decrees, EPA requirements, and SOPs. Skyello extracts every obligation automatically.

Deterministic rules

Each obligation becomes a machine-executable rule mapped to specific assets, conditions, and inspection criteria.

Citation at inspection

Inspectors see the exact regulatory source for every checklist item. Full traceability from field to filing.

Built for the field, not the office.

Skyello runs on ruggedized devices in areas with no connectivity, identifying assets even when labels are unreadable — and every inspection is backed by the same regulatory citations, whether the inspector is online or off.

Tag Scanner
Tag #247 36h12 · Active DR-0247 · Process Drain
Tag #247 36h12-00247 Linked to: DR-0247 (Drain)
View Asset
Scan Another
Inspection
3 of 5
DR-0247 Process Drain · Unit 300
BWON
Structural Issues
Cover intact and properly sealed
No cracking in caulk or epoxy
No visible liquid at interface
Corrosion & Deterioration
Operational Issues
Required by Consent Decree § V.D ¶ 26 40 CFR 61.342-1(c)(1)(ii)
skyello Field IO
Inspection Report BWON Walkthrough · DR-0247
Asset DR-0247 · Process Drain
Location Unit 300 · Lakefront
Date Nov 14, 2024 · 09:23 CST
Status Satisfactory
AI-Generated Summary

Walkthrough inspection of DR-0247 completed with all structural and operational checks passing. No cracking, epoxy degradation, or visible liquid material detected at any interface. Asset remains in full compliance.

Compliance Results
Structural 3/3
Corrosion 2/2
Operational 4/4
Regulatory Citations
Consent Decree § V.D ¶ 26 BP Whiting Consent Decree
40 CFR 61.342-1(c)(1)(ii) Subpart V · BWON Standards
Inspector
JM
J. Martinez Field Inspector · Unit 300

Scan & identify

Point your device at any asset. Machine-readable tags survive corrosion, weather, and damage — every asset is identifiable regardless of condition.

Inspect & document

Every checklist item is backed by the exact regulation requiring it. Inspectors complete checks offline and data syncs when connectivity returns.

Report & submit

AI generates compliance reports from captured findings, with full regulatory citations and audit-ready documentation — ready for review and submission.

Then a manager reviews, approves, and closes the loop.

Submitted reports surface in the web dashboard with full compliance analysis, regulatory citations, and one-click approval — no paper, no ambiguity.

app.skyello.com/reports/INS-20241114-0247/review
Reports / INS-20241114-0247
Approve
Deny
Edit

BWON Walkthrough Inspection

Pending Review
Asset DR-0247 · Process Drain
Unit Coker Unit 1 · Lakefront
Date Nov 14, 2024 · 09:23 CST
Inspector J. Martinez · FI-0042
General Summary

Walkthrough inspection of DR-0247 completed with all structural and operational checks passing. No cracking, epoxy degradation, or visible liquid material detected at any interface. All BWON equipment components were visually inspected per consent decree requirements. Asset remains in full compliance with all applicable regulations.

Findings & Recommendations

No deficiencies identified during this inspection cycle. Recommend continuing weekly inspection schedule for Lakefront BWON equipment per Consent Decree § V.D ¶ 26. Next scheduled inspection: Nov 21, 2024.

POG Record — DR-0247
Type Drain
Control Closed vent system
Condition Good
Visual No cracks, no liquid
Olfactory No odors detected
Auditory No unusual sounds
Compliance Status
Satisfactory
9 Total Rules
9 Passed
0 Failed
Regulatory Citations
Consent Decree § V.D ¶ 26 BP Whiting Consent Decree
40 CFR 61.342-1(c)(1)(ii) Subpart V · BWON Standards
40 CFR 61 Subpart FF NESHAP · Benzene Waste
Inspector
JM
J. Martinez FI-0042 · Field Inspector
Signed

And when the inspection doesn't need a human — Skyello dispatches drones and robotic agents using the same rules, the same citations, the same standard.

Your next inspection is coming. Be ready.

Skyello automates regulatory parsing, deploys drone and human inspections, and delivers full citation traceability — so every obligation is met, documented, and defensible.